Commercial Budget and Phasing

Separate shell, services, joinery, and furniture so quotes can be compared and work can be phased without a visual mismatch.

Budget4 min readCommercial Design Library

Commercial numbers jump when vendors hide HVAC, fire, and IT in a single lump. Split the packages. Spend first on services coordination and durable joinery. Feature walls can follow if the palette is locked.

Compare like with like

Ask every vendor to split civil, electrical, HVAC, fire, joinery, and loose furniture. A cheap joinery quote that excludes the ceiling is not cheaper.

Landlord base-build items should be listed so you do not pay twice for flooring or HVAC that is already there.

  • One sheet for scope inclusions
  • Contingency of 10 to 15 percent until drawings freeze
  • Long-lead items listed with dates
  • IT and security as their own lines

Open a wing, not a half-finished floor

If you occupy in phases, finish a complete zone: ceiling, floor, power, and furniture. A strip of leftover shell beside new desks looks temporary for years.

Lock laminate, handle, and glass specs in phase one. Factory batches can then match months later.

  • Phase by zone, not by trade across the whole floor
  • Document finishes after the first area signs off
  • Plan quiet hours if the rest of the office stays live
  • Keep a snag buffer before the board meeting date

Questions about this guide

Short answers before you freeze drawings or materials.

Contact us

Services coordination, glass partitions, and late layout changes. Joinery is rarely the only culprit.

Yes if sizes are measured into the new plan. Mixing two desk systems without a layout often looks accidental.

Use the commercial fitout estimator for a range, then a measured proposal with a room list and service assumptions.

Have a Space to Design?
Let's Get It Done Right.

Speak with our team and get a clear plan for your interiors - design, cost, and timeline.