Before an Office Fitout

Prepare approvals, services, and a decision path so factory production is not waiting on a logo colour.

Process4 min readCommercial Design Library

Fitouts slip when drawings are not frozen and the landlord still has open comments. List base-build facts, name one decision owner, and agree what “done” means: snags closed, labels on rooms, and a clean floor for IT.

Know the shell you are inheriting

Get the landlord’s grid, HVAC, fire, and toilet locations in writing. Photograph shafts and beam drops. A pretty layout that hits a wet stack will be redrawn.

Confirm access hours, hoist, and material storage. Night work costs more but may be the only way if neighbours occupy.

  • Base-build drawings on file
  • One client decision owner
  • A freeze date for layout and finishes
  • IT, security, and furniture vendors named early

Occupy only when snags are listed

Walk every room with a list. Test lights, AC, doors, and access control. Joinery alignment and lock sets should be tuned before the team moves in with boxes.

Keep a small defect window. Changing the layout after production is not a snag. It is a new job.

  • Room-by-room snag list
  • Keys, cards, and as-built points documented
  • Cleaning after other trades, not during
  • A clear extra-work process if scope grows

Questions about this guide

Short answers before you freeze drawings or materials.

Contact us

Months, not weeks, if you need factory joinery and coordinated services. A date without a freeze is not a programme.

Only with a hard hoarding line and safety plan. Dust and noise will hit the live side. Phasing by wing is cleaner.

Headcount, a floor plate, brand references, and the opening date. Photos of the empty shell help.