Before You Renovate
Prepare for a smoother renovation - from timeline expectations to final handover.

Timeline
What Happens, and in What Order
Interior projects move through design, production, and site installation. Skipping steps in design usually costs time later on site.
A realistic residential timeline includes measurement, layout approval, 3D and material sign-off, factory production, site readiness, installation, and snag closure. Compressing the approval stage rarely shortens the calendar - it usually lengthens it.
- Design & approval - layouts, 3D views, material selections
- Production - factory manufacturing after sign-off
- Site readiness - civil, electrical, and painting prerequisites
- Installation & handover - fitting, punch-list, and final checks

Site Readiness
Get the Space Ready Before Install Teams Arrive
Installation quality depends on the condition of walls, floors, and services. Small civil fixes are easier before cabinetry arrives.
Wet-area waterproofing, final electrical points, and level floors prevent the classic problem of beautiful modules fighting crooked walls. Clear a staging area for materials so installers are not improvising storage in finished rooms.
- Complete waterproofing and tile work in wet areas first
- Finalize electrical points based on approved layouts
- Ensure floors are level where modular units will sit
- Clear storage space for material delivery and assembly

Handover
What a Proper Close-Out Looks Like
Handover is more than installation - it includes alignment checks, hardware tuning, and clarity on care and warranty.
Walk the snag list room by room before final payment. Soft-close adjustments, edge touch-ups, and care instructions should be documented so the home stays as good as day one.
- Shutter alignment and soft-close adjustment on site
- Snag list closed before final payment
- Care instructions for finishes and hardware
- Warranty terms documented for modular scope
Pre-Renovation Checklist
- Approved layout saved and shared with all trades
- Material selections signed off in writing
- Move-out or room-clear plan for install dates
- Single point of contact for site decisions
Delays We Help Clients Avoid
- Changing layout after production drawings are released
- Appliance models selected after kitchen carcass is built
- Painting schedule conflicting with modular installation
- Multiple decision-makers giving conflicting site instructions
Gallery
Visual notes
Spaces and details that sit behind this topic.



Coordinate carefully - many projects paint walls before install and touch up after. Agree the sequence in writing so carpentry and painting do not block each other.
Aligned shutters, closed snags, care guidance, and documented warranty for the modular scope - not only a visual walkthrough.
Begin design and measurements a few months before you need the space. Factory production and site work need a frozen drawing set, not last-week decisions.
For turnkey interiors we coordinate design, factory production, and installation. Civil and MEP trades are aligned to that programme so handover stays in one conversation.